Redland-1, which reached a total depth of 3,804 metres on 23 January 2014, exhibited significant gas shows during drilling. An interpretation of the wireline log data indicates the target interval to be gas saturated, which is supported by mud gas readings of up to 800 units. Redland-1 is currently being cased pending subsequent hydraulic stimulation and flow testing as part of a multi-well stimulation campaign beginning in the third quarter of 2014.