Alot of talk about LV, very little about BM. Except for the diagram where a proposed pipeline to Geelong Port is drawn on.
Still, at least it puts to bed rumours that Exergen would abandon their PCDP plans, as if that was going to happen.
2-4 years from July 2012 was the timeframe they had to build the PCDP. Wonder when/if Mantle will start considering buyback rights.