Now less than 3 months to go before ENI has to make the call for both Heron and Blackwood.
The other win in the mid-year report was that ENI and MEO "will hold a technical workshop during Q1 2014 to review the results of a number of studies undertaken by the Operator and also integrate the Blackwood-2 well information with existing geotechnical data to update the Blackwood resource assessment".
Again, could not have asked for a better outcome at this point in the process. ENI have undertaken a number of studies and are still keen to hold a formal workshop to consider each report's findings and discuss options.
Adl
Add to My Watchlist
What is My Watchlist?