RMX 0.00% 0.1¢ red mountain mining limited

opening price afer announcement , page-36

  1. 223 Posts.
    that's gota grow with results still coming in

    gota love this tho

    Average mining cost is A$3.40/t mining inventory and $2.60/t waste. Transportation of mining inventory from Kay Tanda West to the Lobo processing plant is estimated at A$7.20/t. The total cost is A$37 per mining inventory tonne (includes all high grade, low grade and waste mining and transport).
 
watchlist Created with Sketch. Add RMX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.