A new job posted 31st March from ALERE
Process Engineer - "Work in conjunction with the AMT team to design, fabricate and support products from inception through to production, for a next generation Lateral Flow diagnostic product platform. This role will directly impact the platform/product design and the manufacturing process starting as a 100 Million device prototype line with volumes increasing as more assays and product formats are added. Platform and manufacturing process design will support high volume production and low variability process controls.
ALERE JOB - LATERAL FLOW
This is the second job posted for this in the last week or 2
- Forums
- ASX - By Stock
- ADO
- alere next generation lateral flow platform
alere next generation lateral flow platform
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADO (ASX) to my watchlist
|
|||||
Last
2.1¢ |
Change
-0.001(4.55%) |
Mkt cap ! $51.83M |
Open | High | Low | Value | Volume |
2.2¢ | 2.2¢ | 2.1¢ | $14.69K | 692.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1113604 | 2.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.2¢ | 180000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1113604 | 0.021 |
10 | 1829550 | 0.020 |
10 | 3200136 | 0.019 |
11 | 1900665 | 0.018 |
4 | 194160 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.022 | 180000 | 1 |
0.023 | 857853 | 5 |
0.024 | 1206228 | 2 |
0.025 | 195344 | 4 |
0.027 | 680612 | 2 |
Last trade - 16.10pm 09/07/2024 (20 minute delay) ? |
Featured News
ADO (ASX) Chart |