Hi Redgum,
As you rightly point out the all weather road from Balama to Pemba is completed with bridges over all river crossings. Maybe TJ is referring to the seasonal creek crossings between the road and the graphite mountain.
These are absolutely irrelevant in the scheme of things and will be dealt with appropriately during the course of construction.
Yes, an all season crossing will be built and will be in place prior to shipping commencing. How important is this on the scale of 1 to 100? About 99 I reckon. We are talking about one 10 meter wide creek crossing and another few smaller "ditches".
Pathetic that it was even raised by TON as a point of difference.
- Forums
- ASX - By Stock
- SYR
- infrastructure
infrastructure, page-8
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYR (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.0¢ |
Change
-0.005(2.22%) |
Mkt cap ! $227.6M |
Open | High | Low | Value | Volume |
22.0¢ | 23.3¢ | 21.5¢ | $638.1K | 2.853M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 64122 | 22.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.5¢ | 11500 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 64122 | 0.220 |
6 | 199417 | 0.215 |
9 | 289725 | 0.210 |
14 | 333135 | 0.205 |
28 | 1263689 | 0.200 |
Price($) | Vol. | No. |
---|---|---|
0.225 | 11500 | 2 |
0.230 | 194425 | 12 |
0.235 | 168466 | 6 |
0.240 | 282470 | 7 |
0.245 | 279399 | 7 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
SYR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online