Yes Tin, as I understand it the front end of the plant, crushing circuit etc is obsolete and needs total replacement, the back end has been refurbished.
Initial production is the reprocessing of a small stockpile of fines, to be followed by the processing of the larger stockpile that I presume has already been thru the crushing circuit.
As the front end is replaced next Q they will move to a fresh mining campaign.
In the meantime we should also get the feasibility on Ph2 this Q.
Lots happening, just a little more patience required I'm thinking.
- Forums
- ASX - By Stock
- VXL
- bot is still with us
bot is still with us, page-23
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)