T4P - I think you got first phase testing in a nutshell.
"Preparing...running packers...interpreting wireline logs...pulling out and moving in the work-over rig...installing testing equipment...increasing temporary storage capacity"
Maybe minus test equipment as its already in place.
Here's a pic to demonstrate test procedure...
- Forums
- ASX - By Stock
- ETR
- expected log results 7days now 21days
expected log results 7days now 21days, page-123
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable