Drilling for copper [shallow, open pit depth] at Mt Gunson in South Australia commenced on the 27th of Janurary with a 2 week completion date and a total of 700 metres drilled. The programme should finish this week, watch for movement in SP as this will run hard on positive results, the downside however is very limited being underpinned by the extremely rich sand mining venture in WA.
Add to My Watchlist
What is My Watchlist?