It appears the island of Ameland are having their second tender round for BlueGen...
Translated Link
Opening tightened round enrollment
We are very pleased with the large number of applications that we have received in the first tender round. Thanks for all the entries! On the basis of the criteria indicated a selection. The result of this is communicated to the persons who have registered.
The applications and the selection is made shows that there is room to re-open to the registration.These stricter enrollment round is specific to the postcode areas 9161 and 9162, Hollum and Ballum. All criteria for this second round will find here.
Business owners and residents of these postcode areas have until July 17, 2014 to be eligible for getting home from a highly innovative fuel cell. The first selection shows that especially farms, shops, group stays and locations where homes or apartments are attractive rented.
Participation
New subscription Hollum and Ballum
The successful initial subscription period is already closed. This has shown that there is room to ask for the postcode areas 9161 and 9162, Hollum and Ballum. Opened a second subscription Below you will find all the necessary information on how to participate.
What can you expect?
In the summer of 2014 will be placed on Ameland with residents, businesses and the municipality 45 fuel cells. The system represents an investment of approximately € 30.000, - and will be installed free of charge at home with the participants. After this, for a period of 5 years the network of fuel cells can be controlled and optimized, the energy and cost savings for the participants as a collective. At best use the savings on your energy bill can be up to € 1400, - per year (over € 116, - per month).
The fuel comes in a set to stand. Alongside the regular system It is an addition to the existing facility so the existing system will only get reinforcement. If the fuel off the supply falls unnoticed back on the existing systems.
Participants acknowledge the importance of the research project. The project is specifically focused on the collective optimization with 45 fuel cell operating as one whole. This also means that during the entire project period to cooperate in the project. In practice, this means that the participants will not be able to operate the fuel cell. Itself
The cost of participation comprise 50% of the realized savings. Participation will always deliver more than what it costs.
Example: If a participant in a month € 100, - is realized in savings on the energy bill then this € 50, - the reimbursement of costs to the project and € 50, - for the participant.
The fuel cell will continue throughout the project owned by the municipality of Ameland and may, after the project period of five years on payment of the sum of € 1, - will be taken over by the participant.
The system in all-
- 1x BlueGen fuel
- 1x Boiler
- Full installation
- 5 year warranty
- 5 years of full service and maintenance
- Smart "smart grid" control via Internet
- CO2 reduction obv gas: about 50% (based on Biogas: 100%)
- Hot water (60-70 deg C) per day: 200 Liter
- Own reliable power
- Savings (based on 13,140 kWh usage): approx 1.400, - excl. VAT
Criteria for participation
The first round of applications is already completed. At this time, there is room for new applications that meet the criteria below. Selection of participants is a qualitative selection and will be based on the best suitability with respect to the following criteria. If the subscriptions the number of available fuel cells exceeds and is equally appropriate on the basis of the criteria, then certainly a draw under supervision.
In order to qualify for the second round of registration, the following criteria apply:
- Hold a location on Ameland (as a resident or business owner)
- Profile and connection less than or equal to 3 × 80 Amps
- An annual consumption of electricity between 5500 and 30 000 kWh per year
- Preferably a minimum of 200 liters of hot water consumption per day
- Gas pipeline
- Electricity connection
- Exhaust air
- Internet
- Postcode area 9161 or 9162
- More than one device per connector
- Proportional distribution by sector
- Energy supplier (the project participants will benefit from the same energy supplier)
- Households of municipal councils and municipal officials are excluded from registration
Note:
Even if your company meets the aforementioned criteria, then it may be that your site does not meet the criteria of law and security. Therefore, before you get always prepositioned watched by a qualified installer or the location of all the technical and safety requirements. Definitive assignment
Click here to download. registration form
You can express your interest by signing in at the e-mail address for July 17, 2014 [email protected] .
Upon registration, contact will be taken with you.
Cheers
SynQuasi
Add to My Watchlist
What is My Watchlist?