ROOSEVELT PROJECT
Australia II 12KA 6, #1-29H, (SSN 100%)
A work over rig was moved onto the well July 16th to re-establish production. Rods were parted at the top of the pump. Tubing was pulled to retrieve the pump. Tubing, rods, and a new pump were run back in hole, and the well was put on production July 18th. Since then, the well has flowed 317
bbls oil at a rate of 159 BOPD.
- Forums
- ASX - By Stock
- SSN
- Ann: Operational Advisory
Ann: Operational Advisory, page-2
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)