As far as I can make out Atwood Orca has not moved. However if the rig is " to arrive in mid August to drill the two Manora development wells" they better get a move on as they would have a haul of around 800+ km and that could take 4/5 days (The rig is currently on Permit G11/48 in the South of the Gulf of Thailand)
![]()
Add to My Watchlist
What is My Watchlist?