TGS 0.00% 4.9¢ tiger resources limited

What is TGS really worth?, page-57

  1. 1,313 Posts.
    lightbulb Created with Sketch. 362


    - Commercial production was at Kipoi SXEW within six weeks
    reached after the start of operation.

    - Production of 1,501 tonnes of copper cathode in July.

    - On track the increased forecast of 14,000 tonnes of copper cathode in the
    2014 to achieve.

    Perth, Western Australia, Australia. 13 August 2014 Tiger Resources Ltd.
    (WKN: A0CAJF, ASX: TGS) announced today that the solvent extraction and
    Electro-extraction system (Solvent Extraction and Electro-Winning, SXEW) on
    the Kipoi Copper Project in the Democratic Republic of the company
    Congo (DRC) has reached commercial production of copper cathodes.

    The company reached the milestone of commercial production in
    July and produced 1,501 tonnes of copper cathode at 72% of rated power.

    Tigers Managing Director (CEO), Brad Marwood said that the
    Achieve commercial production within six weeks of
    Commissioning of the project and the quality of the local teams
    demonstrate.

    "We have a very good working team and we vigorously pursue the
    next target, the full rated output of 2,083 tonnes of copper cathode per
    Month, "Mr. Marwood added.

    "Often it can take over six months, a SXEW to full
    To bring production. I expect that we will achieve this goal earlier
    to be. "

    Tiger expects the investment in this calendar year 14,000 tons
    Copper cathode and 25,000 tonnes of copper cathode in its first full 12
    Months will produce with commercial production.

    background

    The Kipoi Kupferprokjekt is located about 75 km north-northwest of Lubumbashi in
    the Katanga Province of the DRC. Tiger has a 60 -% - Percentage of La Société
    Exploitation de de Kipoi SPRL (SEK), a company registered in the DRC
    Company that owns the project assets and the operator at Kipoi
    is.

    Tiger led to Kipoi by a development in phases. The Phase 2
    Solvent extraction and electro-extraction system (Solvent Extraction and
    Electro-Winning, SXEW) began in May 2014 with the production of
    Copper cathodes. This first phase of SXEW is expected to
    25,000 tonnes of copper cathode in its first full 12 months with
    commercial production produce. The Phase 1 HMS system (Heavy Media
    Separation) is Kipoi in production since 2011.

    The Phase 1 HMS-operation has heaps with 159,600 tonnes of contained copper
    produced. These dumps provide the material for the SXEW during
    the first three years of operation.

    The predicted cost of the SXEW plant over the life of
    Mine (LOM) are at $ 1.04 per pound and the projected LOM C3
    Costs (total costs including investment expenses) will be
    $ 1.75 per pound.

    It is envisaged that ore from Judeira and other deposits within the
    Kipoi project area as well as from the nearby Lupoto project (100% Tiger
    Resources) is also processed in the SXEW operation. This has
    additional yields and expanded as the feed for the SXEW
    available ore reserves. The increase in resources in these deposits
    is possibly the mine life and / or the annual flow rate
    increase the plant.

    For more information, please contact
 
watchlist Created with Sketch. Add TGS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.