The question will be one of volume, if it's 2m wide, they have 50m up dip to stope, and they have 50m length of high grade, at an sg of 3, that's in the order of 15k tonnes, can they get it out in 3 months? Let's hope so, should make some good money.
I think they need to start doing some drilling, don't need JORC status classification, just need to get the geometry right for mine planning. Good looking vein, so let's hope they can get the tonnes out!
- Forums
- ASX - By Stock
- MNE
- Ann: Metallum achieves El Roble's highest ever copper result
Ann: Metallum achieves El Roble's highest ever copper result, page-14
-
-
- There are more pages in this discussion • 162 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online