Operations could have slowed right down as not much use spending money when licence applications are still pending
There is probably very little happening at Panga either. We know we need 3 mines to be productive to be able to garner some success but with only 1 in the bag..........why not have lengthy siesta's and longweekends and a skelton staffing arrangement and sit and wait until we have all 3 in the bag...............that could change sentiment
- Forums
- ASX - By Stock
- MNE
- Ann: Metallum achieves El Roble's highest ever copper result
Ann: Metallum achieves El Roble's highest ever copper result, page-161
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)