Confused, page-34

  1. 2,306 Posts.
    Thanks for your post Pedro ... and the on site weather up date ...

    .. if it has been heavy rain in the area it would be a most plausible explanation in any drilling delay .... would be the inability to get water to the diamond drill rig quick enough for a continuous daily drilling ...

    ... the Water bore is 40km from the drill site, but takes about 2 hours to get there, so a 5-6 hour round trip ...

    ... so imagine how long the trip would be in muddy wet .. and possibly impassable conditions during the wet ...

    ... Loving the irony ... that the drilling may be held up because of lack of water ... because it is raining ...
    Last edited by philbar: 30/10/14
 
watchlist Created with Sketch. Add AMD (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $21.07M
Open High Low Value Volume
0.1¢ 0.2¢ 0.1¢ $6.466K 5.092M

Buyers (Bids)

No. Vol. Price($)
128 328407228 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 119897283 16
View Market Depth
Last trade - 14.15pm 30/08/2024 (20 minute delay) ?
AMD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.