CLE 0.00% 0.1¢ cyclone metals limited

What's the value of CFE now?, page-3

  1. 60 Posts.
    Is there scope to achieve 100% capacity? Where would the operating costs per tonne stand for Timis once the mining gets underway?

    If I recall from previous research London Mining was achieving a $77/t operating cost on about 1.5mtpa. That figure to sure come down a little with increased capacity if achievable (outdated figures though).

    I am hopeful these do rise as I recently jumped on board with a speculative, but I'm not getting my hopes up on a mammoth 60c a share position.
 
watchlist Created with Sketch. Add CLE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.