Today’s metallurgical results and the imminent announcement of the JORC Resource will propel Magnis to a lead candidate for future graphite production.
The metallurgical test program has been conducted in close association with the Pre-Feasibility Study (PFS) for the Nachu Graphite Project. Data from metallurgical testing has been the basis for a large portion of the process design. The key tasks of process design and equipment specification are now complete with the current focus on pricing and logistics.
We are moving full steam ahead into production in 2015.
Ann: Exceptional Flake Graphite Metallurgical Results Continue, page-5
Add to My Watchlist
What is My Watchlist?