Maybe VPE want to surprise us on the up side this time.
Mirage1 is flowing 400 bls
Mirage 2 is not tested but revealed the same zones as Mirage 1 but no flow rates yet.
Mirage 3 flowed for 1 hour at a rate which would be 350 bls per day.
Mirage 4 yet to drill the Murta sands but hopeful.
It's hard to see that 1000 bls per day will not be achieved or even more.
MT.
Add to My Watchlist
What is My Watchlist?