Guys
While I was a bit disappointed with the announced DST result, I have emailed the company and await a response. However, I have thought about it and reasoned that this result was oil flowed to the surface ie. not pumped, from an open hole test.
I would have hoped the pressure from a "higher to prognosis" interval would have delivered some reasonable flow rate. The thicker interval as well should have been better. However, limited oil surface does not mean the well will not be productive on pump when the hole is cased etc.
I think we are owed an interpretation of the result and I have asked for that from ITC.
Add to My Watchlist
What is My Watchlist?