    now wembley no events until '07. Multiplex are the laughing stock of the world. The UK journos wrote they wouldn't use them for a garden shed:

    LONDON, Apr 1 (SW) - The new Wembley Stadium is not expected to be ready before February 2007, as result of several setbacks during construction.

    The venue was initially expected to be ready in May, and was scheduled to host the FA Cup final. This match will now have to be played in Cardiff, while new venues will also have to be found for the Charity Shield and two qualification matches of the English national team.

    Recently, the roof of the stadium dropped down one meter with a heavy delay as consequence. The costs of the project have exceeded one billion Euros.
 