HI mark , all heavy machinery hates to sit idle regardless of the condition when shut down ,( when electrical circuits are off line they attract moisture) transfer pumps , conveyor and plant electric motor windings attract moisture ,bearings seize, corrosion/rust takes place every wear especially in the wet and high humidity , sediment residue sits in pipes , sumps etc and can be all most impossible to flush requiring full pipe work section change outs or strip down and recon , electrical distribution centre breakers switchboards circuits etc all have to be proven and hate moisture and can dead short on start up , many issues will confront production crews on initial start up .
When leaving electrical equipment , especially three phase power generation should have CONSTANT electrical circuit warming in place when idle in the wet season .
much can be prevented with good care and maint , but not all ,it all costs and the longer it sits the more likely you will have many start up issues .
- Forums
- ASX - By Stock
- PRX
- Ann: Despatch of Letters to Shareholders
Ann: Despatch of Letters to Shareholders, page-19
Featured News
Add PRX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.664M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $995 | 497.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
32 | 103187431 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 4564001 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
32 | 103187431 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 4564001 | 4 |
0.003 | 23430389 | 19 |
0.004 | 5055526 | 7 |
0.005 | 889000 | 1 |
0.007 | 540000 | 1 |
Last trade - 14.08pm 07/10/2024 (20 minute delay) ? |
Featured News
PRX (ASX) Chart |