EXT 7.69% 1.2¢ excite technology services ltd

must be taking a breather to gain strength, page-10

  1. 966 Posts.
    re: 3 months is not long best to sit back and watch the fun - we have a long way to go - it will take 3-4 months if everything goes to plan (which it will ) for drill results - if we get the go ahead - then we will go to a Pre-Feasibility study - and then to a Final Feasibility and then on to a Bankable Feasibility Study (BFS) which should take about 12 months and if we come up with a JORC categry grade - we are in - and during all that we will have the odd placement here and there and a lot of fun with the share price rising and falling - so sit back and enjoy the ride.

    Cheers
 
watchlist Created with Sketch. Add EXT (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
-0.001(7.69%)
Mkt cap ! $18.42M
Open High Low Value Volume
1.3¢ 1.3¢ 1.1¢ $84.64K 7.406M

Buyers (Bids)

No. Vol. Price($)
2 252718 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 1929641 3
View Market Depth
Last trade - 14.31pm 08/11/2024 (20 minute delay) ?
EXT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.