Hand held XRF used to estimate average grade of boulder at 29%! In direct contradiction of the Competent Person Statement on XRF. But hey, there's a water bottle ....
And the cabling/electrics was not the last thing to be done. Still no tank farm or piping to the gennies, or even the contrat for it. Still got valves to be installed (valves are not usually part of an electrical installation) and of course 450km of cabling.
Nothing on the finance. Lot's of photos.
Laughable.
- Forums
- ASX - By Stock
- CDU
- What a farce.
What a farce.
-
- There are more pages in this discussion • 168 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity
MND
Monadelphous inks $200M contract with Woodside to help build Pluto LNG – but will it make Scarborough cheaper?