HCY halcyon group ltd

copper

  1. 1,727 Posts.
    Thursday, 20 April 2006
    Ref: 606097
    Company Announcements Office
    Australian Stock Exchange Limited
    Level 4 Exchange Centre
    20 Bridge Street
    Sydney NSW 2000
    DRILLING TO COMMENCE AT HIGH GRADE COPPER PROJECT
    The Directors of Halcyon Group Ltd (ASX: HCY) are pleased to announce that the Company will commence
    drilling next week at its newly acquired High Grade Copper Project located at Mount Pleasant. The initial 12
    hole drill program is designed to confirm the mineralisation before proceeding to a systematic drill out to
    bring the deposit to JORC standard. Confirming the size and grade of the deposit would confirm potential to
    quickly develop a mining operation producing a high grade copper-silver-gold concentrate at the current
    record high prices.
    MOUNT PLEASANT COPPER PROJECT HIGHLIGHTS:
    • 1997 Non-JORC resource of 134,200 tonnes @ 4.32% Cu (~5,800 tonnes of
    Copper Metal) based on 49 percussion drill holes and 17 diamond drill holes for
    4,600 metres of drilling.
    • Record Copper Prices around US$6,600/t or ~A$8,900/t (up 16% since
    acquisition).
    • In-situ ground value of ~A$56 Million with Gold & Silver credits.
    • Deposit is close to surface (<90 metres deep) and therefore amenable to open pit
    mining.
    • Well located near infrastructure, 32 kilometres northwest of Kalgoorlie.
    • Gold equivalent value is approx 15.5g/t (using commodity prices as of April 19, 2006).
    • Better drill intersections include:
    • 9.1m @ 19.69% Cu & 233g/t Silver which equates to 9.1m @ 70.5g/t Gold
    from 59.4 metres,
    • 4.6m @ 7.73% Cu & 75g/t Silver which equates to 4.6m @ 27.3g/t Gold
    from 51.8 metres and
    • 2.4m @ 10.88% Cu & 13g/t Silver which equates to 2.4m @ 36.3g/t Gold
    from 85.0 metres.
    For further details on the Mount Pleasant Copper Project please refer to the previous announcement released
    on April 6 2006.
    Kind regards
    HALCYON GROUP LIMITED
    Andrew Radonjic
    MANAGING DIRECTOR
    I
    nformation in this report pertaining to exploration results was compiled by Mr A Radonjic who is a Member of the Aus.I.M.M. with not less than 5 years
    experience in the relevant fields, and who consents to the report appearing in the form and context in which it appears.
    I
    nformation in this announcement pertaining to exploration results was compiled by Andrew Radonjic, the managing director of Halcyon, who is a Member of The
    Australasian Institute of Mining and Metallurgy.
    Greenstone
    Granitoids
    Sediments
    Fault / Shear
    LEGEND
    PERTH
    Kalgoorlie
    Western
    Australia
    Proterozoic Dyke
    KALGOORLIE
    Mount Pleasant
    Copper Project
    Aphrodite
    ~900,000oz Au
    Broad Arrow
    ~600,000oz Au
    Paddington Group
    > 4Moz Au
    Kanowna
    ~5Mozs Au
    Golden Mile
    ~54Mozs Au
    Kundana
    ~5Mozs Au
    Mt Pleasant
    ~3Mozs Au
    0 10
    KILOMETRES
    Project Regional Setting
    Nickel Deposit
    (with Nickel endowment)
    Gold Deposit
    (with Gold endowment)
    Scotia
    ~35,000t Ni Metal
    Bardoc
    Gold/Nickel
    Project
    HALCYON GROUP L IMITED
    0
    Scale GDA Zone 51
    Laterite
    Acid Prophyry
    Interpreted Fault
    Zone of Shearing
    Pit / Shaft / Mine
    Tenement Boundary
    121° 16' 00"E 121° 16' 30"E
    30°30'30"S
    30°30'00"S
    250m
    BLACK FLAG
    FAULT
    Golden
    Buckle
    P24/3379
    P24/3380
    BLACK FLAG FAULT SPLAY
    BLACK FLAG FAULT SPLAY
    BLACK FLAG FAULT SPLAY
    MOUNT PLEASANT COPPER PROJECT
    Simplified Geology, Tenements and Targets
    6 624 000mN
    6 625 000mN
    334 000mE
    New Mt. Pleasant
    Copper Mine
    Mineralised Body
    (Copper - Gold - Silver)
    3.7m @ 5.33% Cu, 108g/t Ag
    3m @ 2.26% Cu, 1g/t Ag, 3.66g/t Au
    2.4m @ 10.88% Cu, 13g/t Ag
    9.1m @ 19.69% Cu, 233g/t Ag
    4.6m @ 7.73% Cu, 75g/t Ag
    2.0m @ 6.55g/t Au
    1.0m @ 15.2g/t Au
    GEOCAD (WA) Pty Ltd Path..halcyon\tulloch\mp_geol.dgn Apr 06
    NOTE: Selected drillhole intercept shown,
    projected to surface
    (Cu - copper; Ag - silver; Au - gold)
    Old Mt. Pleasant Copper Mine
    (Mined 84.3t @ 7.6% Cu)
    Gabbro
    Altered Gabbro
    LEGEND
    Section 6 624 490mN
    Basalt
    Sediments, mafic and
    intermediate volcanics
    HALCYON GROUP L IMITED
    MOUNT PLEASANT COPPER PROJECT
    Copper Cross Section 6 624 490mN
    Gabbro
    Black Shale
    Basic Volcanics
    -50mRL
    -100mRL
    Surface
    -75mRL
    0 25m
    Scale
    MPP123 MPD015
    MPP
    19A
    MPP
    19B
    MPD
    016
    MPP
    19C
    Quartz Porphyry
    Intermediate
    Volcanics
    3.0m @ 3.3% Cu
    101.6m
    70.1m
    83.8m 82.6m
    89.9m
    103.9m
    7.6m @ 4.70% Cu, 79g/t Ag
    3.7m @ 5.33% Cu, 108g/t Ag
    6.1m @ 1.84% Cu, 37g/t Ag
    1.8m @ 1.0% Cu, 27g/t Ag
    334 200mE 334 250mE 334 300mE
 
watchlist Created with Sketch. Add HCY (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.