Hewjet
I don't understand your comments.
I thought I had already explained, it's not ore being lost, it's unnecessary dilution from the headwall because the piecework rates were based on draw-down tonnage, which is common practise in the industry. And the stopes were being over-drawn during the breaking cycle which caused excessive dilution.
Changing the piecework rates is one of a number of improvement initiatives introduced by Rob Gregory. He has already made a huge difference over his 9 months in post.
Head grade should now improve over the next 10 months and throughput will also improve once the new service shaft is commissioned in c. Sep 2016.
Thus throughput will eventually reach 204kt/qtr from the current 180kt/qtr and fully diluted head grade should reach c. 7.2g/t. Recovery is already in the range of 93-95%. So overall production is set to rise by stages until the LT sustainable level is reached in 1Q16.
CPDLC
- Forums
- ASX - By Stock
- X64
- MML - London Presentation report 16/4
MML - London Presentation report 16/4, page-14
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add X64 (ASX) to my watchlist
(20min delay)
|
|||||
Last
57.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $129.8M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
X64 (ASX) Chart |
Day chart unavailable
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online