The SP on AIM is ticking back up , probably in anticipation of next weeks updated study which will hopefully see us with an enviable production cost , last trade went through at 0.68p or 1.34c
14.3 g/t Au and 59.9 g/t Ag must make a big dent in our production costs and in increasing our annual production
The 24/6 processing plant will shave a fair bit from our start up costs and allow further production cost savings .
One week to go !