After a quick read of the RISIP presentation, everything appears to be well thought out and the work on the list of the major problems that require urgent attention will commence asap. Additional drilling, which is also planned asap, could increase the total size of the total resource substantially.
According to the last bullet point in the summary:
• Frontier will undertake a capital raising (July/August) to commence a diamond drilling program and undertake a feasibility study with the aim of bringing the Gold Ridge Mine back into production as soon as possible
Seems fair enough.
Cheers and GLTA!
- Forums
- ASX - By Stock
- LNR
- Ann: Resources Investment Symposium Investor Presentation
Ann: Resources Investment Symposium Investor Presentation, page-2
-
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LNR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.001(16.7%) |
Mkt cap ! $8.552M |
Open | High | Low | Value | Volume |
0.3¢ | 0.4¢ | 0.3¢ | $3.09K | 897.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1350558 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 21933541 | 24 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1350558 | 0.003 |
53 | 56735562 | 0.002 |
18 | 80923078 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 21933541 | 24 |
0.005 | 10883155 | 14 |
0.006 | 18274224 | 16 |
0.007 | 4911573 | 12 |
0.008 | 25970000 | 9 |
Last trade - 15.08pm 27/09/2024 (20 minute delay) ? |
Featured News
LNR (ASX) Chart |