EGR 4.04% 9.5¢ ecograf limited

Ann: Epanko Mineral Resource Upgrade, page-3

  1. 1,916 Posts.
    Epanko Mineral Resource Upgrade

    Mineral Resource estimate for the Epanko deposit has now been upgraded and re-classified as
    Measured and Indicated (M+I)
    62% of the Mineral Resource estimate is now M+I which totals 14.5 Mt at 9.8% TGC for 1.4 Mt of
    contained graphite
    46% of M + I Mineral Resource estimate classified as Measured
    The Mineral Resource supports the previously announced expanded production scenario which
    would involve producing 100,000tpa of concentrate over 20 years with no further exploration
    required
    Upgraded Mineral Resource estimate will be the basis for the BFS which is nearing completion

    Kibaran Resources Limited (ASX: KNL), (‘Kibaran’ or the ‘Company’) is pleased to announce the Mineral
    Resource for the Epanko Graphite Project in Tanzania has been upgraded with a significant proportion of the
    previously reported Indicated Mineral Resource now classified as Measured. The Mineral Resource estimate
    totals 23.3 million tonnes (Mt) grading 9.4% total graphitic carbon (TGC) for 2,194,600 tonnes of contained
    graphite
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
(20min delay)
Last
9.5¢
Change
-0.004(4.04%)
Mkt cap ! $43.13M
Open High Low Value Volume
9.5¢ 9.5¢ 9.5¢ $27.54K 289.9K

Buyers (Bids)

No. Vol. Price($)
2 8339 9.5¢
 

Sellers (Offers)

Price($) Vol. No.
9.9¢ 3703 1
View Market Depth
Last trade - 15.44pm 03/09/2024 (20 minute delay) ?
EGR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.