Drilling rates are highly variable and therefore frustrating but perhaps work off 15m per 12 hour shift as an average. After a long break from drilling the rig will need to be re-commissioned no matter how good it's standby maintenance has been. Then ground conditions, driller and crew competence, weather conditions, site access, water access, etc all come into play. Drilling rates tend to increase as the programme continues. With good ground conditions, drill crew, and a well maintained rig then 40-50m per shift is not unusual.
- Forums
- ASX - By Stock
- ICG
- Drill depth
Drill depth, page-6
-
- There are more pages in this discussion • 96 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.078M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $539 | 107.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1640161 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 2085339 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1640161 | 0.005 |
9 | 3404194 | 0.004 |
13 | 19206780 | 0.003 |
4 | 4399980 | 0.002 |
3 | 6199950 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 2085339 | 5 |
0.007 | 1447760 | 5 |
0.008 | 1450000 | 3 |
0.009 | 1033282 | 3 |
0.011 | 350000 | 1 |
Last trade - 12.28pm 01/11/2024 (20 minute delay) ? |
Featured News
ICG (ASX) Chart |