HHR 0.00% 0.8¢ hartshead resources nl

Cretaceous results maybe later next week, page-9

  1. 784 Posts.
    Some points to think about:-
    Trip time ? (Drilling folks may assist here)
    Water depth is 7139 ft
    Last reported depth 3400 metres TVDSS is 11155 ft.
    At which point casing was being installed and set.
    Drill pipe is in lengths of 135 ft that is 136 lengths for trip.
    I presume the Miocene has been drilled through and is being used in part, as calibration of the seismic.
    I would expect the Cenomanian and Aptian would span around 400 to 500 metres,(no idea) being the Cretaceous zone.
    Drilling rate in the order of 80 metres per day (guess). Maybe 7 to 8 days.
    Then log the exposed zone.
    Also doing sidewall core samples etc etc.
    Then run more casing to protect the Cretaceous.
    My uneducated guess would guess around 2 weeks between announcements , at best.

    I look forward to educated input please.

    Cheers IFINO
 
watchlist Created with Sketch. Add HHR (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.000(0.00%)
Mkt cap ! $19.66M
Open High Low Value Volume
0.7¢ 0.8¢ 0.7¢ $3.435K 480K

Buyers (Bids)

No. Vol. Price($)
9 8065197 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 4672839 4
View Market Depth
Last trade - 13.02pm 08/11/2024 (20 minute delay) ?
HHR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.