PYM 0.00% 0.0¢ pryme energy limited

Ann: June 2015 Quarterly Activity and Cashflow Report, page-4

  1. 39 Posts.
    Is this too basic of an analysis. Four holes and some 4 rivers nets $800k. Each quarter costs $2-2.5m. So they need 8 more holes to break even.
    Newkirk is cheaper to drill and costs are shared 50/50, similar stacked play potential. So they need to drill 16 holes at Newkirk to break even at a cost to them of approx $4m. Better start drilling the poo out of it.
 
watchlist Created with Sketch. Add PYM (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.