First you were a broker next you appear to be a mining engineer or geotechnical engineer....very confusing...
broker engineer?
"My assesment before the event" so you work on site?
"I had specifically done a lot of work on pit stability and this was always a risk - my assessment before the event was it was a low risk. Was I wrong because it happened? Not really, because calling an earthquake in that area and depth right at that time was a very low probability event."
- Forums
- ASX - By Stock
- RED
- slip volume not very material it seems
slip volume not very material it seems, page-90
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RED (ASX) to my watchlist
|
|||||
Last
39.5¢ |
Change
-0.020(4.82%) |
Mkt cap ! $2.686B |
Open | High | Low | Value | Volume |
40.5¢ | 41.0¢ | 39.0¢ | $9.181M | 23.04M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
34 | 1243803 | 39.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
40.0¢ | 139143 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
33 | 1242044 | 0.390 |
15 | 644451 | 0.385 |
29 | 1163879 | 0.380 |
5 | 300070 | 0.375 |
26 | 801786 | 0.370 |
Price($) | Vol. | No. |
---|---|---|
0.400 | 139143 | 5 |
0.405 | 607644 | 6 |
0.410 | 622427 | 9 |
0.415 | 292677 | 10 |
0.420 | 496877 | 18 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
RED (ASX) Chart |