Lib's FTTN - 'Completely stuffed it', page-17

  1. 26,550 Posts.
    lightbulb Created with Sketch. 1
    1/ Which deal, did you get the NBN installed before the Telstra deal was done in 2012?

    2/ Yep.

    3/ No. I'm suggesting the boring equipment can more up the line in increments of 250m until they get the desired length they require.

    4/ If the NBN was only for the next 5 to 10 years, the "average household" may get by with copper. But the NBN is being built to replace aging unreliable and poor quality infrastructure, and to ensure we have the infrastructure to lift the Minimum speed (download and upload), and to cater for growth in our communication requirements, short term and well into the future.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.