EWC 10.0% 0.9¢ energy world corporation ltd

Last years Annual Report, page-7

  1. 221 Posts.
    lightbulb Created with Sketch. 17
    Could be a bad mistake selling now Moosey.

    Tanks were completed in May 2015 at both Sengkang & Pagbilao. GTT will take about 6 months to line the tanks with their membrane. So that takes us to November 2015.

    Pagbilao power station looks well advanced, so completion of Stage I could be around January 2016.

    Skys the limit after this.
 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.