Hi All,
Hahahaha.....Love this bit;
"Holes KO-212 to KO-219 were drilled as sterilisation holes for possible stockpile areas, and are located between the Kolosori Ridge area and the barge loading facility."
So an area on the west was checked for stockpile usage and was found to contain 4m seam with Ni 1.9% Av Grade plus 1.51 from surface, (KO-219 6.5m @ 1.51% Ni from surface 2.5m @ 1.73% Ni from 2.0m 1.5m @ 2.09% Ni from 4.5m)
Finally found a site issue; where to stockpile without piling on good Nickel deposits........Now there an issue that I like.....lol
- Forums
- ASX - By Stock
- AVQ
- Ann: Isabel Nickel Project drilling defines thick mineralisation
Ann: Isabel Nickel Project drilling defines thick mineralisation, page-3
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)