The results of the drilling were very positive, in particular at the E1 Target where mafic rocks with a
favourable litho-geochemical signature (including low TiO2 and Zr) were intersected in drill hole PRC003
(Figure 3). The intersection of the mafic lithologies has confirmed the validity of recently acquired
gravity data to target for prospective nickel-copper bearing lithologies within the Fraser Range. Samples
from PRC003 are currently being assayed and a petrographic analysis completed.
- Forums
- ASX - By Stock
- AMD
- Ann: Exploration Update - Plumridge Nickel Project
Ann: Exploration Update - Plumridge Nickel Project, page-2
-
-
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AMD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(20.0%) |
Mkt cap ! $21.07M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.2¢ | $60.39K | 24.20M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
161 | 282722478 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 142102280 | 28 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
160 | 282622478 | 0.002 |
67 | 267206930 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 142102280 | 28 |
0.004 | 87921941 | 29 |
0.005 | 33611312 | 20 |
0.006 | 41100379 | 23 |
0.007 | 19607924 | 15 |
Last trade - 15.34pm 09/07/2024 (20 minute delay) ? |
Featured News
AMD (ASX) Chart |