AMD 20.0% 0.2¢ arrow minerals ltd

Ann: Exploration Update - Plumridge Nickel Project, page-2

  1. 2,102 Posts.
    The results of the drilling were very positive, in particular at the E1 Target where mafic rocks with a
    favourable litho-geochemical signature (including low TiO2 and Zr) were intersected in drill hole PRC003
    (Figure 3). The intersection of the mafic lithologies has confirmed the validity of recently acquired
    gravity data to target for prospective nickel-copper bearing lithologies within the Fraser Range. Samples
    from PRC003 are currently being assayed and a petrographic analysis completed.
 
watchlist Created with Sketch. Add AMD (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
-0.001(20.0%)
Mkt cap ! $21.07M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $60.39K 24.20M

Buyers (Bids)

No. Vol. Price($)
161 282722478 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 142102280 28
View Market Depth
Last trade - 15.34pm 09/07/2024 (20 minute delay) ?
AMD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.