BKT black rock mining limited

Drilling underway at Ulanzi

  1. 37,911 Posts.
    lightbulb Created with Sketch. 828
    Been following this since the previous announcement. This stock could be a sleeper (under the radar)....


    Drilling underway at Cascade and Ulanzi

    • Strike length of the Ulanzi discovery increased to 2.5km

    The first RC hole completed at Cascade contains visibly higher-grade graphite mineralisation than seen at Epanko.

    The Ulanzi drill programme is of significant interest because of the spectacular grades recently reported and its size
    potential. Ulanzi mineralisation is located on a prominent 2km ridge which offers favourable geometry for simple
    mining at low strip ratios should a resource be delineated.

    The Ulanzi graphite mineralised footprint is interpreted to be 2,500m x 200m, significantly larger than Cascade or
    Epanko north.

    A decision was made to drill test several locations within the Ulanzi mineralised zone whilst drill rigs were available
    following the completion of Epanko north infill drilling. Six to eight holes are initially planned with drilling to continue upon confirming widths, grade and strike extension.

    upload_2015-8-27_11-1-18.png
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
2.0¢
Change
0.001(5.26%)
Mkt cap ! $33.85M
Open High Low Value Volume
1.9¢ 2.0¢ 1.9¢ $32.81K 1.724M

Buyers (Bids)

No. Vol. Price($)
1 380431 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 1523517 7
View Market Depth
Last trade - 16.10pm 12/09/2025 (20 minute delay) ?
BKT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.