    Viability of both gas and Train line following same corridor is a very feasable idea

    Will giles link them together

    There is some interesting lines paragraph 's in this   Have put up silk rd route before south pacific down to Australia  etc

    Port Jackson Partners, who completed work on the North East Gas Interconnector, will do the economic modelling which will include an engineering and commercial study. Six firms responded to the scoping study request.

    Chief Minister Adam Giles said the Northern Territory Government was currently working with its Queensland counterparts on the railway link to create a corridor. Queensland is not contributing to the cost of this scoping study.


    “This is a building Australia project. Potentially it can help protect the Great Barrier Reef in the long, long term. Eventually you could bring cargo through Darwin and save days in sailing time,” he said.

    “At the same time the Port Jackson Partners are looking at the economic modelling, what you need to do to get this to stack up, we are also working conjunctively with the Queensland Government on starting the process of clearing railway corridors and getting environmental approvals and getting the pathway right.”
    If the economics of the railway link does not stack up the corridor will be protected.

    The Darwin to Alice Springs railway cost $1.2 billion to build and is 1100km in length. The Territory Government contributed nearly $500 million into its construction.
    Byron Pirola, director of Port Jackson Partners, said the challenge was not the engineering but the commercial case. Industry sectors including defence, agriculture and the resources would be prime commercial targets.

    “Our job is to get in quickly and, with the existing engineering work and all the estimates you can, is to work out if you can get close to a value creating project for the country and the government,” he said.
    “Is there the demand? How does this economic case stack up? How does this rail link compete with existing transport? Is there enough volume? Is it the right time?

    The scoping study will determine the cost of building and how to get to the next step. The current changes in Asian market with China indicating it wishes to build a “maritime Silk Road” will be taken into account.
    “There will be judgments about the type of engineering that will be required and this will impact on cost,” Mr Pirola said.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
-0.002(3.64%)
Mkt cap ! $39.49M
Open High Low Value Volume
5.5¢ 5.5¢ 5.3¢ $83.26K 1.516M

Buyers (Bids)

No. Vol. Price($)
2 234750 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 340510 1
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.