RED 1.35% 37.5¢ red 5 limited

Questions on the report., page-23

  1. 1,327 Posts.
    lightbulb Created with Sketch. 9
    Collincj;
    Yes I believe the Sept quarterly is due out at the end of Oct; Da
    Looks like I got moderated for discussing open pit image view orientation; a bit sensitive IMO.

    I believe the large slip reported in July this year occurred on the East side of the open pit; IMO no images of the slip on the East side was presented to shareholders to date via ASX announcement; however an image of an apparent slip on the East side was posted by Dr S on the 23/7/2015; the date the image was taken is available via a metadata file contained with the image; a metadata file is contained in most digital images and shows the date the image was taken.

    I have presented the Dr S images to ASIC on the 24/7/2015 together with the metadata files for correlation with RED 5 ASX announcements dated 7th July 2015. I wrote to ASIC in June 2015 about my concerns about the open pit condition following 6 months of posts on HC discussing the same; the discussion to ASIC focussed on pit floor flooding, ore recovery & reporting and IMO slip; I believe my June 2015 letter was warranted as the East slip was reported about 1 month later.

    I doubt I would publish the 4 letters to ASIC on HC; too sensitive for HC IMO.

    Kind Regards HoM.
 
watchlist Created with Sketch. Add RED (ASX) to my watchlist
(20min delay)
Last
37.5¢
Change
0.005(1.35%)
Mkt cap ! $2.567B
Open High Low Value Volume
37.0¢ 37.8¢ 37.0¢ $1.646M 4.403M

Buyers (Bids)

No. Vol. Price($)
63 1371852 37.0¢
 

Sellers (Offers)

Price($) Vol. No.
37.5¢ 1185681 38
View Market Depth
Last trade - 12.01pm 05/07/2024 (20 minute delay) ?
RED (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.