Brief update:
Top hole section was completed at SNE-3 yesterday and the Topaz mobilised to SNE-2 location at about 7PM. Drillship Athena joined it later on. Look fwd to an update on the depth the casing was run & set at. (At SNE-1 13" csg for the tophole was at apprx 1907mTVD).
Attached is a map showing the path of Athena's mobilisation apprx 6.2kms north from SNE-3. Timeframe should b under 6 days for the tophole section dressage, before they drill on. Safe drilling.
- Forums
- ASX - By Stock
- FAR
- SNE-2: rig arrival
SNE-2: rig arrival
-
-
- There are more pages in this discussion • 96 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.0¢ |
Change
-0.015(2.91%) |
Mkt cap ! $46.20M |
Open | High | Low | Value | Volume |
52.5¢ | 52.5¢ | 50.0¢ | $45.91K | 88.73K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5993 | 50.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
50.5¢ | 5982 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 0.500 |
2 | 28930 | 0.480 |
2 | 70000 | 0.475 |
3 | 84150 | 0.470 |
2 | 60000 | 0.465 |
Price($) | Vol. | No. |
---|---|---|
0.520 | 50000 | 1 |
0.530 | 10000 | 1 |
0.540 | 22471 | 1 |
0.550 | 82295 | 3 |
0.590 | 5000 | 1 |
Last trade - 15.08pm 28/06/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online