General message was that EPC and FERC were the hurdles that tollers were waiting to be signed off on, now we wait for them to wrap up their gas supply arrangements and sign the BTAs. No time frames, but talk was positive.
A lot more conscious about how loose their lips were, hotcopper got a few mentions