Highlights:
MAJOR DISCOVERY EXTENDS TO 3.2KM STRIKE LENGTH AND REMAINS OPEN TO THE NORTH AND SOUTH
- Mineralisation has been extended to 3.2km strike length and remains open to the north and south (increase from 1.2km previously reported)
- Early JORC modelling is showing a significant size of graphitic mineralisation at Namangale
- A further 2 Diamond holes have been drilled intersecting 38m and 74m of mineralisation
- The company has continued to observe medium to high grade coarse flake graphite in
numerous core samples taken in the diamond drilling- Assay grades and metallurgical tests are being processed and are expected within a week.
- Drilling has now been completed, with a total of 61 holes now completed for 3,259m of RC drilling and 326m of diamond drilling at Namangale
- Excellent infrastructure in place with deep water port 140km from site with electricity, water and sealed roads available
Bigger still! Getting very, very interesting!
Ann: Major Discovery Extends to 3.2KM Stike and Remains Open, page-4
Add to My Watchlist
What is My Watchlist?