Considering CWE just did a roadshow and raised cash I find that the lack of a announcement very disingenuous and they should update all holders as to why the buoys are out of the water and if they are going back in the drink. Majority of holders would not have been expecting all buoys out of the water and it goes against what had previously been said that they would switch etc. A bit of clarity on performance of ceto 5 is now required for both energy output and any "refurbishment" including cost of that to get them back in the water. I didn't think the towers were a original feature and were in place for the data link possibly but odd they are off? Just why wouldn't they leave them out there producing energy and proving up wave energy all the time collecting data in different conditions. Just how have the tethers and connectors stood up? Are they still in place with marker buoys attached or to the tethers ?
Add to My Watchlist
What is My Watchlist?