ADV 0.00% 13.0¢ ardiden ltd

Ann: Ardiden Secures Advanced Lithium Project in Canada, page-3

  1. 25,679 Posts.
    lightbulb Created with Sketch. 1230
    Another leaky ship..
    Key Points:
     Ardiden enters option agreement to acquire 100% of the Seymour Lake
    Lithium-Beryllium-Tantalum (Spodumene) Project in Ontario, Canada.
     Seymour Lake has over 4,000m of historical diamond drilling which has
    confirmed the potential for high quality spodumene mineralisation
    containing extensive zones of lithium, tantalum and beryllium. Key
    features of the project include:
    o Mineralisation hosted in extensive outcropping spodumene-bearing
    pegmatite structures;
    o Widths of up to 26m of lithium mineralisation intersected in historical
    drilling;
    o Excellent infrastructure (road, rail and power) within the leading
    mining jurisdiction of Ontario, Canada;
    o Significant historical lithium intersections include:
     2.081% Li2O over 16.90m
     1.584% Li2O over 26.13m
     2.386% Li2O over 9.20m
     1.735% Li2O over 14.25m
     1.325% Li2O over 23.85m including 2.059% Li2O over 9.00m
    and 2.232% Li2O over 3.04m
     1.837% Li2O over 11.80m
     2.212% Li2O over 5.70m
     2.100% Li2O over 6.75m
     1.475% Li2O over 17.72m including 1.937% Li2O over 12.97m
     In addition, tantalum and beryllium grades of up to 1,180 ppm
    (Ta2O5) and 1,270ppm (BeO) respectively were intersected
     Lithium is anticipated to be in tight supply as the demand for lithium-ion
    batteries undergoes transformational growth over the next decade. In
    addition, the project shows potential for tantalite and beryllium as byproducts/credits,
    both of which are worth ~US$500/kg.
     The proposed acquisition is highly complementary and synergistic to
    Ardiden’s existing 100%-owned Manitouwadge Jumbo Flake Graphite
    project in Ontario for a number of key reasons:
    o Lithium-ion batteries use lithium as the cathode and graphite as
    the anode. Transformational growth is predicted in this market.
    o The Seymour Lake Project can be developed by Ardiden’s existing
    experienced Ontario-based team, which has led the highly successful
    graphite drilling program in 2015.
    o Both projects are located less than 4 hours from a key infrastructure
    hub at Thunder Bay which is less than 100km from the US border
    and has existing rail, road and port facilities which can also access
    the Atlantic and service European markets.
 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.