We have CDP detailed construciton drawings for coldry priced and ready to go...adaption to site very minor imo.....matmor and its integration is what is slowing it down imo as not advances, stake holders what to see its integration, and e have more stake holders. However the integration is surely not within the 'actual' coldry cpd plant but nearby or adjacent stockpile. Integration factors would be drawing services for both setups and not just coldry plant....so consideration to early works infrastructure intregration. Pretty sure a techno economic feasibility for coldry alone is a waste of time? Pitty we can crack on with Coldry after sorting electrical and hydraulic engineering for services supply for both, while we develop the matmor pilot doc's.
- Forums
- ASX - By Stock
- ECT
- Ann: Binding Agreement with NLC and NMDC secured
Ann: Binding Agreement with NLC and NMDC secured, page-197
Featured News
Add ECT (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.343M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
56 | 26759338 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 17667152 | 56 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
56 | 26759338 | 0.002 |
23 | 27361532 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 17667152 | 56 |
0.004 | 8358928 | 14 |
0.005 | 3296859 | 21 |
0.006 | 3178567 | 7 |
0.007 | 918333 | 2 |
Last trade - 16.12pm 04/11/2024 (20 minute delay) ? |
Featured News
ECT (ASX) Chart |
Day chart unavailable