Looks like fantastic initial results and there is plenty happening as per the ann.:
Next Steps
Key activities currently underway at the LD Project include:
- Core drilling on LD for Resource definition is continuing.
- Brine pump testing at other cased bore locations on LD is in progress.
- Sustained brine trench pump testing is about to commence while results from earlier drawdown pumping are expected to be received in February.
- Process water exploration is continuing with bore pumping expected to commence shortly following receipt of statutory approvals.
- Heavy machinery for construction of pilot ponds and an associated causeway has been mobilised to site.
- Process design and other project studies are well advanced with detailed design engineering to commence in the June quarter.
- Environmental impact statement nearing completion for submission to the EPA.
- Forums
- ASX - By Stock
- RWD
- Ann: First pass pumping results at LD
Ann: First pass pumping results at LD, page-3
-
- There are more pages in this discussion • 62 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RWD (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.114M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 72800 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.0¢ | 7500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 72800 | 0.040 |
1 | 200000 | 0.037 |
1 | 40000 | 0.035 |
1 | 100000 | 0.029 |
1 | 50000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.050 | 7500 | 1 |
0.061 | 10000 | 1 |
0.077 | 132000 | 1 |
0.130 | 27227 | 1 |
0.000 | 0 | 0 |
Last trade - 16.12pm 13/09/2024 (20 minute delay) ? |
Featured News
RWD (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online