This one time at band camp !
http://www.takeovers.gov.au/content/DisplayDoc.aspx?doc=media_releases/2015/059.htm&pageID=&Year=
"The Panel noted that CuDeco is required to use a full prospectus following an ASIC determination under section 713(6).1Some or all of the concerns outlined in the application were likely to be addressed once the prospectus was released, and the Panel was minded not to conduct proceedings."