88E 25.0% 0.3¢ 88 energy limited

Ann: HRZ Play Further Derisked, page-4

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 25 Posts.
    Icewine #1 Core Evaluation Update – HRZ Play Further De-risked

    88 Energy Limited (“88 Energy”, “the Company”, “Operator”) (ASX, AIM: 88E) is pleased to provide the following update on the evaluation of the core over the HRZ interval from the recently drilled Icewine#1 exploration well.

    Highlights

    •   Matrix permeability within the cored HRZ shale exceeds expectations, several times

      greater than effective cutoff in all 18 core samples measuredo 2 samples displayed permeability too high to be measured using standard

      technique (indicating possible presence of “permeability super highways”)

    •   Porosity confirmed at upper end of expectations as per prognosis

      Overview

      Matrix permeability and porosity of the HRZ shale were measured using the Gas Research Institute (GRI) method, which involves crushing the core sample to fine grained particles thereby eliminating coring and sampling induced fractures to ensure more accurate results.

      Both the permeability and porosity results are at the upper end of expectations and significantly in excess of the cutoff limits required for the HRZ shale play to be successful.

      Additional corrections will be made to the porosity data integrating nano-scale porosity within the kerogen and other mineral components. It is anticipated that these corrections will increase the already high porosity values.

      As previously reported, light oil and condensate was observed leaching from core material, confirming the presence of liquid hydrocarbons at the Icewine#1 location (see graphic below). This further supports the core and geochemical analysis that the thermal maturity window at Icewine#1 is consistent with pre-drill modelling. Final thermal maturity data is expected within 7 days.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.