Using costs from a period of high strip ratios, high waste removal volume and a large number of risk mitigation projects, then projecting these into a period of low strip ratios, low waste removal volume and bugger all risk mitigation projects. You engineers do some strange things.
I would suspect that the AISC will start to start to fall fairly significantly from here on. Won't know until late April.
- Forums
- ASX - By Stock
- RED
- Ann: Siana underground mineral resource
Ann: Siana underground mineral resource, page-32
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)